WE NEED TO TALK

Me kōrero ngātahi tātou



Plains Ward Projects

OPEN

Hey Plains, here’s a snapshot of some things planned in your ward:‎

ProjectDescriptionWhenHow much
Kerepehi raw water mainReplacement of the Kerepehi raw water main with consideration for growth and future proofing for climate change.2022/23$2.35m
Manganese treatment for Hauraki Plains water supplyTo address issues with water from the Waihou River a robust treatment process needs to be developed. Phase one consists of monitoring the issue, with phase two being design and construction.2022/23$6.75m
Training lights at Hugh Hayward domainJoint funding to install new overhead flood lights at the domain.2023/24$100,000 (joint funding)
Pump track at Hugh Hayward domainJoint funding towards the installation of a pump track (BMX) at the domain.2025/26$75,000 (joint funding)
Western Plains stopbank reconstructionProject to raise the existing stopbanks to maintain the existing flood protection level of service.2021/22 – 2022/23$700,000
2025/26 – 2026/27$450,000
2030/31$400,000
New toilet in PatetongaA proposed new toilet facility to cater to the demand of passing travellers.2021/22$100,000
New entry ramp at the Ngatea poolInstallation of a new accessibility ramp into the Ngatea pool.2022/23$150,000
Ngatea library and service centre developmentDevelopment of a combined service centre and library facility in Ngatea at the existing site.2021/22$1.3m
Adult fitness equipment at Hugh Hayward domainJoint funding towards the installation of new adult fitness equipment in the domain.2025/26$20,000 (joint funding)

 

How to tell us what you think | He aha ōu whakaaro, korero mai

The most fun way is to take the online journey with Alice in Our Place and give us your feedback as you go.

Or you can download a copy of our consultation document and fill out our online feedback form.

You can also write to us, give us a call, or flick us a message on Facebook or Instagram

Get involved
Scavenger Hunt
Important dates
  • 30 April 2021, 5pm  – written feedback closes.
  • 18/19 May 2021 – Hearing of submissions a chance to drop in and talk to our Mayor and councillors.
  • 18/19 May 2021 – We’ll review all of your feedback and make some decisions.
  • 23 June 2021 – Our Long Term Plan will be adopted
  • July 2021 – we will let you know of the decisions made.